Manufacturing Excellence: A Case Study on the Improvement Journey of Operations Management

Jia YUAN

Abstract


This case illustrates the operations management improvement journey of LP Semiconductor Co. Ltd. What the teaching case describes includes strategic thrusts and priorities of improvement, design of operations, managing of operations, and adaptation of operations. With the information provided by the case, participants could discuss the current situation and action for continued improvement from all dimensions of operations management. From the teaching case, participants could learn how to use the theories and methods of operations management in actual business practice in order to achieve the ultimate goal of manufacturing excellence.

Keywords


Case study; Operations management; Joint venture; Performance

Full Text:

PDF

References


Anderson, J. C., Schroeder, R. G., Tupy, S. E., & White, E. M. (1982). Material requirements planning systems: The state of the art. Production and Inventory Management, 23(4), 51- 66.

Cachon, G. (2004). The allocation of inventory risk in a supply chain: Push, pull and advance-purchase discount contracts. Management Science, 50(2), 222-238.

Chase, R. B., Jacobs, F. R., & Aquilano, N. J. (2004). Operations management for competitive advantage (10th ed.). New York, NY: McGraw-Hill.

Hahn, G. J., & Kuhn, H. (2012). Value-based performance and risk management in supply chains: A robust optimization approach. International Journal of Production Economics, 139(1), 135-144.

Hambrick D. C., & Mason. P. A. (1984). Upper-echelons: The organization as a reflection of its top managers. Academy of Management Review, 9(2), 193-206.

Kimura, O., & Terada, H. (1981). Design and analysis of pull system, a method of multistage production control. International Journal of Production Research, 19(3), 241-253.

Slack, N., Chambers, S., & Johnston, R. (2004). Operations Management (4th ed.). London: FT Prentice Hall.

Sugimori, Y., Kusunoki, K., Cho, F., & Uchikawa, S. (1977). Toyota production system and Kanban system materialization of just-in-time and respect-for-human system. International Journal of Production Research, 15, 553-564.

Wikner, J., Naim, M. M., & Rudberg, M. (2007). Exploiting the order book for mass customized manufacturing control systems with capacity limitation. IEEE Transactions on Engineering Management, 54 (1), 145-155.

Zohar, D. (1997). Rewiring the corporate brain: Using the new science to rethink how we structure and lead organizations. San Francisco: Berrett-Koehler.




DOI: http://dx.doi.org/10.3968/j.mse.1913035X20130703.2554

Refbacks

  • There are currently no refbacks.


Copyright (c)




Share us to:   


Reminder

  • How to do online submission to another Journal?
  • If you have already registered in Journal A, then how can you submit another article to Journal B? It takes two steps to make it happen:

1. Register yourself in Journal B as an Author

  • Find the journal you want to submit to in CATEGORIES, click on “VIEW JOURNAL”, “Online Submissions”, “GO TO LOGIN” and “Edit My Profile”. Check “Author” on the “Edit Profile” page, then “Save”.

2. Submission

  • Go to “User Home”, and click on “Author” under the name of Journal B. You may start a New Submission by clicking on “CLICK HERE”.


We only use three mailboxes as follows to deal with issues about paper acceptance, payment and submission of electronic versions of our journals to databases:
caooc@hotmail.com; mse@cscanada.net; mse@cscanada.org

 Articles published in Management Science and Engineering are licensed under Creative Commons Attribution 4.0 (CC-BY).

 MANAGEMENT SCIENCE AND ENGINEERING Editorial Office

Address:1055 Rue Lucien-L'Allier, Unit #772, Montreal, QC H3G 3C4, Canada.

Telephone: 1-514-558 6138
Http://www.cscanada.net Http://www.cscanada.org

Copyright © 2010 Canadian Research & Development Centre of Sciences and Cultures