Research on Post-Evaluation of Oilfield Ground Engineering Project
Abstract
Based on the research results of the scholars from domestic and overseas, we construct a evaluation index system for post- evaluation of oilfield ground engineering project focusing on the characteristics of the ground engineer project and combining the characteristics of the development of oilfield. The system includes 3 primary indicators, such as pre-project, 8 secondary indicators and 35 tertiary indicators. Multistage fuzzy evaluation with the combination of quantitative analysis qualitative analysis and degree of success method are used for Post-evaluation of oilfield ground engineering project which may lead to the reference of the decision-making of investment and management for oilfield ground engineering project.
Key words: Oilfield ground engineering; Postevaluation; Evaluation index; Multistage fuzzy evaluation
Keywords
References
WANG, Chunguang (2002). Post-Evaluation of Oil and Gas Fields Construction Project. Statistics and Decision, (1), 53-58.
WANG, Yue (2004). Post-Evaluation of Oil and Petrochemical Investment Projects and Case Analysis. Technology Economics, (10), 34-36.
JIANG, Zhihua (2006). Primary Study on Post-Project Analysis of Marine Oilfield Projects. Environmental Protection of Oil & Gas Fields, (3), 122-127.
Yu, Shuqing, & Liu, Chunyang (2007). Study on Comprehensive Assessment Method and Indexes System of Post-Evaluation for Pipeline Construction Projects. Petroleum Engineering Construction, (12), 558-602.
Gu, Xin, & Deng, Kelin (2008). Study on Post-Evaluation of Oilfield Construction Projects. Gansu Science and Technology, 8(15), 66-68.
Guo, Peng, & Li, Zhiyong (2010). Post-Evaluation Theories and Methods Research of International Cooperation in Oil and Gas Exploration and Development Projects. Project Management Technology, 5(5), 66-69.
Huang, Xunan (2010). Post-evaluation Index Systems and Quantified Evaluation of Oil and Gas Exploration Projects. International Petroleum Economics, 1(1), 56-58.
Liu, Hong, Wu, Tingting, & Fang, Guohua (2010). Application of Multi-Level Grey Evaluation Method in Post Evaluation of Urban Flood Control Projects. Journal of Economics of Water Resources, (3), 5-7.
DOI: http://dx.doi.org/10.3968/j.mse.1913035X20120603.Z0137
Refbacks
- There are currently no refbacks.
Copyright (c)
Reminder
- How to do online submission to another Journal?
- If you have already registered in Journal A, then how can you submit another article to Journal B? It takes two steps to make it happen:
1. Register yourself in Journal B as an Author
- Find the journal you want to submit to in CATEGORIES, click on “VIEW JOURNAL”, “Online Submissions”, “GO TO LOGIN” and “Edit My Profile”. Check “Author” on the “Edit Profile” page, then “Save”.
2. Submission
- Go to “User Home”, and click on “Author” under the name of Journal B. You may start a New Submission by clicking on “CLICK HERE”.
We only use three mailboxes as follows to deal with issues about paper acceptance, payment and submission of electronic versions of our journals to databases:
caooc@hotmail.com; mse@cscanada.net; mse@cscanada.org
Articles published in Management Science and Engineering are licensed under Creative Commons Attribution 4.0 (CC-BY).
MANAGEMENT SCIENCE AND ENGINEERING Editorial Office
Address:1055 Rue Lucien-L'Allier, Unit #772, Montreal, QC H3G 3C4, Canada.
Telephone: 1-514-558 6138
Http://www.cscanada.net Http://www.cscanada.org
Copyright © 2010 Canadian Research & Development Centre of Sciences and Cultures