Staged Premium Screen Completion Design for Horizontal Well Based on Laboratory Test: A Successful Application in Block 451, Shengli Oil Field

Yang CHEN, Shaoxian WANG, Zongyi CHEN, Haibo YANG, Jianguo ZHANG

Abstract


Staged premium screen has been applied to balance the inflow profile of horizontal well under open hole completion in Shengli Oil Field, China. Perforation density of base pipe is the key parameter of staged screen for inflow control, however, it is used to be determined by only considering drawdown due to perforation itself, ignoring two dominant parts caused by formation sand filter cake around screen and sand retention material, therefore the decision plan is not suitable. To solve this problem, a laboratory apparatus was run to test a screen sample, and thoroughly analyzed the effect of perforation density on total inflow control drawdown. A base pipe was also tested, working as a reference to screen sample. The test simulated down hole flowing condition in Well DXY451P21, Block 451, Shengli Oil Field, test results were directly utilized to design staged premium screen for this target well. Finally, the following conclusions can be drawn: pressure drop in screen sample is much sensitive to perforation density, and is obviously larger than that in base pipe sample; flowing pressure is mainly lost in formation sand filter cake and sand retention material, where the flow pattern is seepage flow; perforations on base pipe of premium screen mainly play a part in regulating flowing field, i.e. smaller perforation density will lead produced liquid to flow a longer distance in seepage media and bring a larger additional drawdown; the production performance of Well DXY451P21 is much better than adjacent wells, and promotes economic benefits.


Keywords


Perforation density; Staged premium screen; Inflow control; Laboratory test; Horizontal well

Full Text:

PDF

References


Al Marzouqi, A. A. R., Helmy, H., Keshka, A. A. S., Elasmar, M., & Shafia, S. (2010, January). Wellbore segmentation using inflow control devices: Design & optimization process. In Abu Dhabi International Petroleum Exhibition and Conference. Society of Petroleum Engineers.

Chanpura, R. A., Fidan, S., Mondal, S., Andrews, J. S., Martin, F., Hodge, R. M., ... & Sharma, M. M. (2011, January). Advancements in screen testing, interpretation and modeling for standalone screen applications. In SPE European Formation Damage Conference. Society of Petroleum Engineers.

Chanpura, R. A., Mondal, S., Andrews, J. S., Mathisen, A. M., Ayoub, J. A., Parlar, M., & Sharma, M. M. (2012, January). Modeling of square mesh screens in slurry test conditions for standalone screen applications. In SPE International Symposium and Exhibition on Formation Damage Control. Society of Petroleum Engineers.

Dean, W., Qing, H., & Guofeng, L. (2013). Optimization design of the rundle liner completed horizontal wells in the Honghe Oilfield. Journal of Chongqing University of Science and Technology (Natural Sciences Edition), 15(2), 85-88.

Jinzhong, W., Guohua, X., & Lei, C. (2011). Research and application of the staged flow-regulating and water-control technology with screen or tubing in horizontal holes. China Petroleum Machinery, 39(1), 60-61.

Karim, R. A., Goh, K. F. G., Nuriyadi, M. A., Ahmad, N. A., Leung, E., & Murison, J. A. (2010, January). Horizontal Well Optimization with Inflow Control devices (ICDs) Application in heterogeneous and dipping gas-capped oil reservoirs. In SPE Annual Technical Conference and Exhibition. Society of Petroleum Engineers.

Lee, J., Ahn, T., Lee, J. Y., & Kim, S. J. (2013, January). Laboratory test to evaluate the performance of sand control screens during hydrate dissociation process by depressurization. In Tenth ISOPE Ocean Mining and Gas Hydrates Symposium. International Society of Offshore and Polar Engineers.

Lin, L., Bin, T., & Jin, F. (2016). The multi-pronged approach to stabilize production and control water cut in Panyu oil field. Chemical Engineering Design Communications, 42(3), 23-25.

Minulina, P., Al-Sharif, S., Zeito, G. A., & Bouchard, M. J. (2012, January). The design, implementation and use of inflow control devices for improving the production performance of horizontal wells. In SPE International Production and Operations Conference & Exhibition. Society of Petroleum Engineers.

Ouyang, L. B. (2009, January). Practical consideration of an inflow-control device application for reducing water production. In SPE Annual Technical Conference and Exhibition. Society of Petroleum Engineers.

Procyk, A., Gou, X., Marti, S. K., Burton, R. C., Knefel, M., Dreschers, D., ... & Glatt, E. (2015, September). Sand control screen erosion: Prediction and avoidance. In SPE Annual Technical Conference and Exhibition. Society of Petroleum Engineers.

Shan, W. Y., & Zhang, X. (2013). The research for delaying the bottom water coning in horizontal wells application balance screen pipe. In Advanced Materials Research (Vol. 734, pp. 1480-1483). Trans Tech Publications.

Van der Bol, L., McCarty, A., Pritchett, J., Sripornprasert, Y., Goh, G., Ridho, M., ... & Sowmyanarayanan, N. M. (2016, November). ICD design optimisation with single-well dynamic 3D modelling and real-time operation support. In International Petroleum Technology Conference. International Petroleum Technology Conference.

Xu, L. B., Yang, J. H., & Ma, N. (2011). The research for delaying the bottom water coning in horizontal wells application step screen pipe. Science Technology and Engineering, 26, 6298-6302.

Yang, C., Shaoxian, W., & Guoli, D. (2016). A new test apparatus for evaluating premium screen performance. Advances in Petroleum Exploration and Development, 11(1), 30-34.

Yang, C., Zhigang P., & Liqiang, G. (2014). Design of static flow control parameters for equilibrium fluid supply completion of horizontal wells. Oil drilling & production technology, 36(6), 45-49.

Youming, X., Donghong, L., & Haixiong, T. (2009). New-type horizontal well completion method of delaying and controlling bottom water coning. Journal of Southwest Petroleum University: Science & Technology Edition, 31(1), 103-106.

Youming, X., Liming, L., & Haixiong, T. (2011). Well equalizing flowing completion technology to delay and control botton water coning in horizontal well. Petroleum Drilling Techniques, 39(4), 66-71.




DOI: http://dx.doi.org/10.3968/10835

Refbacks

  • There are currently no refbacks.


Copyright (c) 2019 Yang CHEN

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.


Share us to:   


Reminder

  • How to do online submission to another Journal?
  • If you have already registered in Journal A, then how can you submit another article to Journal B? It takes two steps to make it happen:

1. Register yourself in Journal B as an Author

  • Find the journal you want to submit to in CATEGORIES, click on “VIEW JOURNAL”, “Online Submissions”, “GO TO LOGIN” and “Edit My Profile”. Check “Author” on the “Edit Profile” page, then “Save”.

2. Submission

  • Go to “User Home”, and click on “Author” under the name of Journal B. You may start a New Submission by clicking on “CLICK HERE”.

We only use three mailboxes as follows to deal with issues about paper acceptance, payment and submission of electronic versions of our journals to databases:
caooc@hotmail.com; aped@cscanada.net; aped@cscanada.org

 Articles published in Advances in Petroleum Exploration and Development are licensed under Creative Commons Attribution 4.0 (CC-BY)

ADVANCES IN PETROLEUM EXPLORATION AND DEVELOPMENT Editorial Office

Address:1055 Rue Lucien-L'Allier, Unit #772, Montreal, QC H3G 3C4, Canada.

Telephone: 1-514-558 6138
Website: Http://www.cscanada.net
Http://www.cscanada.org
E-mail:office@cscanada.net;  office@cscanada.org

Copyright © 2010 Canadian Research & Development Centre of Sciences and Cultures